VIRTUS designs, builds, runs and maintains data centres in the UK and continental Europe. Its revenue is recurring co-location and lease revenue, at £237.5m, and power revenue, at £188.8m.
VIRTUS Holdco Limited was incorporated in 2011, and its accounts name Temasek Holdings (Private) Limited as ultimate parent, and report a February 2026 agreement for KKR funds and Singtel to buy the remaining stake in its parent STT GDC Pte. Ltd., subject to approvals. The group had 263 employees on average and £427.1M revenue in 2025.
Founded 2011Head office London, United KingdomStaff ~263 (average, 2025)Revenue ~£427.1M (year to 31 December 2025)Website ↗
VIRTUS reported 18,979.7 tCO2e in 2025, up from 18,066.5 t in 2024, with Scope 2 reported as nil on a market basis and Scope 3 limited to grid losses and business travel. It publishes no figure for purchased goods or capital goods, so the size deduction for an incomplete footprint (0.70x) applies. It claims 100% renewable electricity but does not say what backs it beyond PPAs, which its parent's report says cover 17% of consumption; 31MW began only in October 2025. Its net zero 2030 target has two versions, with no SBTi target found. Its parent's report gives Scope 1 as 12,859 t, unreconciled with the accounts' 1,575.1 t.
Virtus Data Centres scores 26/100 (Significant gaps) on SINK's independent climate assessment, scored from public data only. Scores are free. Companies can never pay for anything about their own score. Last verified November 2026.
That places Virtus Data Centres joint 833rd of 994 companies scored, and 39th of 39 in Construction / Real Estate.
Strongest on Controversies & Red Flags and Carbon Footprint: Operations (8/10, 6/10). Weakest on Emissions Trajectory and Nature & Biodiversity Impact (0/10, 2/10).
For each question that lost points, the evidence our public rubric looks for that we didn't find.
A score changes when the evidence does. We use new published evidence at the next rescore. Anyone can send us new evidence, free. How to send it.
Same ten questions for every company. No private weighting.
SINK = (0.3 × Base + 0.7 × Performance) × Scale13 sources used in this assessment. All publicly available. Each row shows which of the ten questions it informed.
31% of them were published by Virtus Data Centres itself; the rest come from independent sources.
Scope 2, 2025: market-based 0 t, location-based 180,820 t. The score uses market-based.
9 of 13 sources are independent of the company.
“Scope 1 - consumption of gas oil/natural gas and HVAC emissions 1,575.1 1,488.9”
“every one of our sites is now certified Zero Waste to Landfill”
“The South West London Waterbodies Special Protection Area”
“Total emissions for year 18,066.5 14,448.4”
“Virtus will offtake 16 percent of the total generation from LID, with a commencement date of 1 October 2025”
“Virtus has subscribed to a combined PPA totalling 31 MW of wind power”
“thanks to partnerships with companies like Bryt Energy”
“the former Molins tobacco machinery site on Haw Lane”
“we use a closed loop chilled water system”
“taking the total number of generators at the installation from 31 to 47”
“an annual carbon offset payment will be made to the local authority for ten years”
If you believe a source has been misread or a newer version exists, submit a challenge.
Use this score in tenders
Send the link, or the one-page score sheet. It links back to this page and every source. Free.
Open the score sheet →Send new evidence, free
Scored low because little is published? Publish what you do and send us the link, free. If it holds up, your score changes, and the change is logged on your page.
How to send evidence →Put your score on your website, free
It shows the current score and links to this page, so it changes when the score does.
Track this score
Bidding for a public contract? Check if you need a Carbon Reduction Plan, free →
Free, independent, every source shown. Send it to any buyer who asks about your sustainability.
Virtus Data Centres sits at the bottom of the construction / real estate pack.
Among the 39 major construction / real estate brands we've scored, Virtus Data Centres sits 39th of 39.
The 3 companies in the sector scoring nearest above Virtus Data Centres.
Yondr reported 150,664 tCO2e in 2025, up from 42,667 t in 2024, but that leaves out purchased goods and capital goods, the materials and equipment for its buildings, so the size deduction for an incomplete footprint (0.70x) applies.
See the breakdown →Kao Data reported 28,085 tCO2e for the year to March 2025, up from 22,837 t, partly through a Scope 3 boundary change, with electricity counted location-based.
See the breakdown →The Boost Society operates mid-sized student housing across France with no emissions data, no decarbonisation targets, and no renewable energy strategy.
See the breakdown →One email, every Sunday. Score changes, new research, the stories behind the numbers. Free.
We'll send one email to confirm. No spam. Unsubscribe in one click.
Checking a company?
Search free →Asked to prove you're sustainable?
Get your business scored, free →Been scored?
Find your page and claim it, free →Scores are free. Companies can never pay for anything about their own score.